“As work continues on a new eastern span of the San Francisco-Oakland Bay Bridge, the bridge was closed over Labor Day weekend to replace a football field-sized section of the bridge’s upper deck. The Metropolitan Transportation Commission created an amazing time-lapse video of the operation. “